If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
The factory pre-wires a shower toggle on the dash, and the wiring is active to this compartment. The wiring is very straightforward, and takes all of about 2 minutes. I used waterproof wire nuts.
Next we cut out an opening in the factory door opening and installed the shower box. On the back side we waterproofed the wood and re-covered it with I/O carpeting and the original welting.
Then close up the compartment, and you have a shower. I also placed a lock on the door to keep it from opening and allowing quick service entry if needed.
Comment