I got this 20v last Sept and have been working on it ever since. Winter project list done so far..
-Winterization and basic mechanical updates (impeller, oils, filters, grease, etc.)
-Add sea strainer & Perko flush valve
-All new stereo system - Apline CDA-118M w/M20 dash remote, 3 sets of new Hetrz component speakers, set of Focal speakers for tower, two JBL 4 ch and one JBL mono amps. (Question - can't seem to get the M20 remote to show temp so if anyone knows how, let me know)
-take out factory balast tanks and replace w/ two 400lb sacks in rear, one 250lb sack in port front locker and a 200lb in starboard locker, replace Johnson 550gpm filling cartiges w/ 1000gpm cartiges (not sure how the 1000gpm cartrige will work but it's got to be a little faster). (Thanks to cpthril and wakemakers for parts and advice!)
-added docking lights (do a lot of late-night beach trips and man that bow hook is down there.)
It's been one hell of a winter project but almost there!
Still have to buff out the hull, paint trailer fenders, install some underwater lights and test all of the pluming I've done. Next big add will probably be the Perect Pass.
Thanks to all that have posted on this site! It's been a great help.
-Winterization and basic mechanical updates (impeller, oils, filters, grease, etc.)
-Add sea strainer & Perko flush valve
-All new stereo system - Apline CDA-118M w/M20 dash remote, 3 sets of new Hetrz component speakers, set of Focal speakers for tower, two JBL 4 ch and one JBL mono amps. (Question - can't seem to get the M20 remote to show temp so if anyone knows how, let me know)
-take out factory balast tanks and replace w/ two 400lb sacks in rear, one 250lb sack in port front locker and a 200lb in starboard locker, replace Johnson 550gpm filling cartiges w/ 1000gpm cartiges (not sure how the 1000gpm cartrige will work but it's got to be a little faster). (Thanks to cpthril and wakemakers for parts and advice!)
-added docking lights (do a lot of late-night beach trips and man that bow hook is down there.)
It's been one hell of a winter project but almost there!
Still have to buff out the hull, paint trailer fenders, install some underwater lights and test all of the pluming I've done. Next big add will probably be the Perect Pass.
Thanks to all that have posted on this site! It's been a great help.
Comment