I currently have 4 rev 8s on my tower, 2 of them need to be replaced (long story)...
Should I buy another pair of Rev 8's ($1050) OR a pair of slightly used Pro 485 HLCD ($1100 for the pair), and put them in-between my 2 rev 8s?
So I can have standard 4 Rev 8s. OR 2 rev 8s and 2 Pro 485 HLCD. IT would cost me about the same.
Thanks fellas,
Should I buy another pair of Rev 8's ($1050) OR a pair of slightly used Pro 485 HLCD ($1100 for the pair), and put them in-between my 2 rev 8s?
So I can have standard 4 Rev 8s. OR 2 rev 8s and 2 Pro 485 HLCD. IT would cost me about the same.
Thanks fellas,
Comment