I am adding some 1100lb fly high sacs on top of my under floor tanks. The floor in the rear compartment has a max load capacity of 80lbs per the warning tag and after stepping into the compartment I believe that rating. I have temporarily cut some 3/4 plywood to span from the stringer to the outer ledge and just set it on top of the floor.
How have you guys reinforced the floor for these heavy sacs?
Sent from my iPad using Tapatalk HD
How have you guys reinforced the floor for these heavy sacs?
Sent from my iPad using Tapatalk HD
Comment