Announcement

Collapse
No announcement yet.

2007 22Ve Ballast Install

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

    #46
    There are two buss lines that run the length of the box. Off of the those the breakers are hung with a screw, that is how the line side of the breaker is connected. The load line side of the breaker is on the outside of the buss lines. So the breaker is held in place by both the screw that connects to the buss and the hole and plastic nut on the outside of the breaker box. The breaker that I got from Mike has both terminal straight. I positioned it in between both buss lines. I didn't want to take everything apart so I put it in there and from the looks I drilled. It ended up that I was a smidge off so I had to enlargen the hole. As always working in confined areas is not easy, I am not a small dude and I had to be careful with the breakers that were already in there.

    Comment


      #47
      Nice labels!

      Comment


        #48
        Getting really close to done. All the wire is ran and tied. Hoses all done. Battery wires cleaned up.

        All that is left are the switches. I wanted to try and match the factory switches. You can not get them in black lettering any more from Tige to match the other switches. They have gone to a white lettering that is not on the led. I was able to find the switches just not labeled, for a 1/3 of the cost of the ones from Tige. I have a couple of ideas on how to label them. They should be here tomorrow and I can finish up.
        Attached Files

        Comment


          #49
          The hoses for the fill and vent might be a bit long but I decided that I could easily change that once I I know for sure what looks to be the best length. Easier to cut then try to add.

          Comment


            #50
            Looks like it's ready for water testing!

            Comment


              #51
              Originally posted by Timmy! View Post
              Looks like it's ready for water testing!
              Just about.

              Comment


                #52
                Ok, so we can water test it next weekend?

                Comment


                  #53
                  SweetWhere are we meeting at?
                  "Failing to prepare is preparing to fail" John Wooden- Rest in Peace

                  Comment


                    #54
                    I guess if the weather is good we could go.

                    Comment


                      #55
                      My wetsuit is ready! I think cherry creek res is open.

                      Comment


                        #56
                        I guess I better get my registration done.

                        Comment


                          #57
                          I did mine online.

                          Comment


                            #58
                            Looking good skippa. We had rain most of today so by the time I got the boat to the house I did not get anything done. However by the end of the week mine should be done. Good luck on the water test.
                            Wake Up or Stay On Shore!

                            Comment


                              #59
                              Skippa; its lookin great - very impressed. Confirm lots of wire ties too.

                              Comment


                                #60
                                Here is the starboard side with a 400# v drive locker sac.
                                Attached Files

                                Comment

                                Working...
                                X