I am a bit late getting started on my winter project, but I have made a bit of progress on the planning and want to get some feedback and help - thanks in advance.
I have a 2008 22Ve with the factory 800 lb. system. In 2008, the aft ballast was a 250 lb hard tank on each side, aft of the storage compartment. On these boats, the installation of the hard tanks required the Batteries on the port side and the TAPS pump and blower on the Starboard side to be pushed forward into the storage compartment and Tige built a step in that compartment to enclose this equip. The step must go!
Here is the plan.
1 - Keep the factory system - why, because I like to do things the hard way , and I believe those aft tanks are good to have and I can fit the custom Enzo in while keeping them.
2 - Relocate the batteries to the forward storage compartment (don't tell my wife)and rebuild the aft port locker to remove the step.
3 - Move the TAPS and blower or work around them in the starboard locker (really not sure how to go here) and rebuild this locker to also remove the step.
4 - Install a custom Enzo sac on each side in the aft lockers
5 - Install two new aerator fill pumps to service the new sacs (one per side), and two new drain pumps (one per side).
6 - reroute the hard tank vent line to a second fill port on the Enzo so that the overflow from the factory tank will aid in filling the new sac.
Here is a schematic of my plan and a bunch of photos showing the lockers as well as the current fill pumps and the area I intend to mount the new fill pumps.
Comments, Ideas, suggestions, thoughts - Thanks all.
I have a 2008 22Ve with the factory 800 lb. system. In 2008, the aft ballast was a 250 lb hard tank on each side, aft of the storage compartment. On these boats, the installation of the hard tanks required the Batteries on the port side and the TAPS pump and blower on the Starboard side to be pushed forward into the storage compartment and Tige built a step in that compartment to enclose this equip. The step must go!
Here is the plan.
1 - Keep the factory system - why, because I like to do things the hard way , and I believe those aft tanks are good to have and I can fit the custom Enzo in while keeping them.
2 - Relocate the batteries to the forward storage compartment (don't tell my wife)and rebuild the aft port locker to remove the step.
3 - Move the TAPS and blower or work around them in the starboard locker (really not sure how to go here) and rebuild this locker to also remove the step.
4 - Install a custom Enzo sac on each side in the aft lockers
5 - Install two new aerator fill pumps to service the new sacs (one per side), and two new drain pumps (one per side).
6 - reroute the hard tank vent line to a second fill port on the Enzo so that the overflow from the factory tank will aid in filling the new sac.
Here is a schematic of my plan and a bunch of photos showing the lockers as well as the current fill pumps and the area I intend to mount the new fill pumps.
Comments, Ideas, suggestions, thoughts - Thanks all.