If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
Picking up my ballast order from the parcel service place tomorrow.
Kid in a candy store.
I finished my install last weekend and was able to ride it this weekend, "Dan and Christy" should have some pictures to post! What all did you get? Pictures!!
5 sacs total
8 pumps
pile of fittings
A mile of hose
What I am plannning is the normal for the 2 rear 750's,
1 pump to fill an intergrated bow and an extra surf sac that I can use under the bow insert cushion when needed. I will have those two bags work off a rule pump to fill via a manifold with 2 shut offs. The manifold I'm thinking will go just inside the access door on the driver consol area. and 3 pumps to empty, one for each leg of the ont. sac and a second for the surf sac. I have picked up a SS quick disconnect for that second bow sac so I can keep things relatively clean.
My neighbor is going to lazer cut a custom aluminum switch plate which I will put just ahead of the shifter somewhere. I really dont want to work this week but go to the lake and install instal install !!
I will make sure I take some pic's along the way !
Comment